Beachborough Construction Update – July 2019
Construction is moving steadily throughout the interior and exterior. The crew is running at between 45-60 persons each day working on exterior siding, mechanical, plumbing, electrical, carpentry, elevators, HVAC, insulation and drywall. 95% of the windows are now in.If you have been driving by, you’ll notice the front lobby area with its over-height 25-foot glass window […]
Season’s Greetings and Sept-Dec 2018 Progress
Season’s Greetings from BeachboroughFraming started on the 4th floor homes in December. We made good progress through the 4th quarter with excellent teamwork by the construction trades. Every engineered wood or steel beam is hoisted into place by Craig-the-crane-man (from Newfoundland) and hand placed and fastened by the IRL framing team (from Ireland). November and […]
Beachborough May 2018 Construction Update
The construction team is making steady progress with the two levels of underground parking nearing completion. The photo above shows the curved driveway ramp coming off the back lane and down to level P1. There have been approximately 50 workers on-site daily for the last month although, at any one moment, at least half of […]